Published by Walker Beak Masonon,Walker Beak Mason's News,Updated on
All our latest news
Industry News
We’re pleased to announce the launch of the new Walker Beak Mason website
21 August 2026
Industry News
Noise NOT at work #2: How Loud Is… Historic Motorsport? A weekend at Spa Francorchamps
22 January 2026
Architectural & Building
Noise NOT at Work #1 – Women’s Rugby World Cup at Twickenham
3 October 2025
Architectural & Building
Updated Draft to British Standard 8233 “Sound insulation and noise reduction for buildings – Guide”
4 August 2025
Environment, Plant & Industry
Environment Agency ‘Method implementation document’ for BS 4142
31 January 2024
Projects
Cliffe Hill Quarry
Jobs Yard Kettering – Residential Development
Logistics Institute University of Hull – M&E Plant
Energy from Waste – Detailed Plant Noise Assessment
Duchess’s Stand, Epsom Downs Racecourse
Cliffe Hill Quarry
WBM liaised closely with the local environmental health authorities in connection with the extended night-time use of the train loading facility.
Jobs Yard Kettering – Residential Development
In addition to the control of external noise, WBM advised on the internal sound insulation, both between flats and between the flats and associated commercial unit.
Logistics Institute University of Hull – M&E Plant
WBM provided a noise assessment of the proposed roof mounted plant both in accordance with BS 4142 and as part of the client’s requirement to achieve credits under BREEAM.
Energy from Waste – Detailed Plant Noise Assessment
WBM were approached to advise on proposals and provide noise measurements, analysis and calculations for two Energy-from-Waste facility sites in Surrey.
Duchess’s Stand, Epsom Downs Racecourse
The diverse range of use of the spaces created interesting acoustic challenges as rooms and partition sound insulation had to be able to cope with varying uses and activities.